Trail Advisory: Uneven Surface at Certain Stretches of Rail Corridor
Some sections of the Rail Corridor have uneven surfaces due at these locations and will carrying out patch repair work progressively from 21 May 2026. This is estimated to be completed by 3Q2026.
Locations:
1.Near Queensway access
2.Near Alexandra Hospital access
We would like to remind visitors to:
-
Slow down when approaching uneven sections
-
Stay alert and focused (e.g. not using mobile devices) when on the trail
Frequently Asked Questions
Why do some sections become uneven over time?
It was an intentional decision to build the Rail Corridor around some of the mature trees in the vicinity so as to retain them as part of Rail Corridor’s role as an ecological corridor. Over time, these tree roots grow close to the surface and start causing unevenness along sections of the trail.
This is why we monitor these areas regularly and carry out patch repairs when needed to maintain safety while balancing the conservation of existing greenery.
You can play your part. Stay safe and focused when hiking. And if you encounter an uneven section or notice any other safety concerns, please let us know via the OneService app or NParks’ feedback form.